On this page [ 6 ]
The license a Arizona solar installer needs
Arizona has no separate solar-PV license. Arizona Registrar of Contractors (ROC) electrical classifications cover residential PV: R-11 Electrical (residential), CR-11 Electrical (dual residential + commercial, covering the C-11 and R-11 scopes), C-11 Electrical (commercial). For all of these, ROC's License Classification Requirements chart says a solar warranty is required 'if any solar performed'. The ROC solar exam ('S') applies to plumbing/HVAC/pool-type solar classes (e.g. R-37, CR-77, CR-78, B-6, KA-6), not to the electrical classes. A.R.S. 44-1762(E) separately requires solar-device installers to hold an appropriate contractor's license.[1]
Search the Arizona Registrar of Contractors[2]
This is the ROC's Contractor Search link from roc.az.gov (2026-07-01 capture). The URL returned HTTP 200 on 2026-11-05.
Consumer protections when you buy or lease
- 3-business-day right to rescind (sale or lease of a solar/distributed energy generation system): A.R.S. 44-1763(A)(3): the sale or lease agreement must include a separately acknowledged provision giving the buyer or lessee at least three business days after signing, and before installation, to rescind.[3]
- Required contract disclosures (A.R.S. 44-1763): The agreement must be signed, dated, and in at least 10-point type. It must also include: major components (make/model) or a production guarantee; warranty periods in bold and initialed; total cost and all fees in bold; incentives used to set the price; tax obligations; whether warranty or maintenance obligations can be transferred; restrictions on transferring the system or the home; estimated lifetime maintenance and operating costs; and the basis of any savings estimate (utility rates, assumed rate increases, production, export compensation). Blank spaces in the agreement must be initialed.[3]
- Lease payments wait for permission to operate: A.R.S. 44-1763(E): recurring lease payments cannot start until the utility grants permission to operate and the lessor has energized and interconnected the system.[3]
- Roof acknowledgment before signing: A.R.S. 44-1763(F): before a residential solar purchase or lease is signed, the licensed contractor must obtain a written acknowledgment that the roof may need repair or replacement during the term, with disclosures about removal/reinstallation costs and possible effects on warranties.[3]
- Minimum warranties: A.R.S. 44-1762(A): collectors, heat exchangers and storage units, and their installation, must carry a warranty of at least 2 years (or an energy production output guarantee). Other components and their installation must carry at least 1 year. Under 44-1762(B), the warranty statement form is subject to ROC approval and is kept on public file with the ROC.[1]
- Roof evaluation by installer: A.R.S. 44-1762(I): before a rooftop install, the licensed contractor must evaluate the roof, recommend an inspection by a licensed roofing contractor, and repair roof damage caused by the installation.[1]
- General contractor contract requirements (over $1,000): A.R.S. 32-1158: contracts over $1,000 must state the contractor's name, address and license number, the dates, scope, total price, deposit and progress payments, and the owner's right to file a complaint with the ROC.[4]
A ten-minute installer check
- Look up the company's license by number with the official lookup above, and confirm the name and address match the contract.
- Ask whether the crew lead holds the NABCEP PV Installation Professional certification (check it in the NABCEP directory[5]). It is voluntary but shows tested experience.
- Get at least three written quotes for the same system size, with the price per watt, panel and inverter models and warranty terms spelled out.
- Ask who will handle the utility interconnection application and the permit, and who pays if the utility requires a meter or panel upgrade.
- Never sign on the first visit; check your cancellation rights and the financing terms, including dealer fees.
Installers we have verified
We only list a company after checking its license record ourselves, and we never show prices or star ratings for installers. No Arizona installers are listed yet; use the checks above for any company you are considering.
FAQ
Frequently asked questions
How do I check a solar company's license in Arizona?
Use the official lookup: Search the Arizona Registrar of Contractors. Search by license number, which should be on the contract and the company's ads.
Can I cancel a solar contract after signing?
Often, yes. For sales made at your home, the FTC's Cooling-Off Rule applies: you can cancel until midnight of the third business day after the sale (Saturdays count) for sales of $25 or more made at your home.[6] Arizona adds its own rules, listed above.
sources
[ 6 ]Every number on this page links to one of these sources. Dates show when we last checked each one.
- Licensing ruleazleg.gov · checked Nov 5, 2026
- Arizona Registrar of Contractors - Contractor Searchazroc.my.site.com · checked Nov 5, 2026
- 3-business-day right to rescind (sale or lease of a solar/distributed energy generation system)azleg.gov · checked Nov 5, 2026
- General contractor contract requirements (over $1,000)azleg.gov · checked Nov 5, 2026
- NABCEP directoriesdirectories.nabcep.org · checked Nov 5, 2026
- 16 CFR Part 429, Cooling-Off Ruleecfr.gov · checked Nov 5, 2026