Estimates use the inputs above and the assumptions in our methodology: PG&E credits exports at Hourly avoided-cost credits; we model about 5¢ per kWh (estimate) (Solar Billing Plan (Net Billing Tariff, 'NEM 3.0')). Prices rise 2.5% a year; panels lose 0.5% a year.
NEM 3.0 in one paragraph
If you are a PG&E, SCE or SDG&E customer and apply now, you are on the Net Billing Tariff, which most people call NEM 3.0. Customers applying for interconnection on or after April 15, 2023 are on the Net Billing Tariff (Solar Billing Plan) under CPUC Decision D.22-12-056. Exports are credited at Avoided Cost Calculator values instead of retail rates.[5] Exported energy earns hourly credits from the CPUC's Avoided Cost Calculator, which are high on summer evenings and low at sunny midday, when most rooftop solar exports. The original customer who interconnects under the NBT is guaranteed the NBT for nine years. Customers who move to the NBT from an older NEM tariff do not get this legacy period.[5] You also have to move to an electrification time-of-use rate: NBT customers must use a specific 'electrification' TOU rate: E-ELEC (PG&E), TOU-D-PRIME (SCE), EV-TOU-5 (SDG&E). Bills are paid monthly, and excess credits roll over until the annual true-up.[5]
The new fixed charge
PG&E, SCE and SDG&E now bill a monthly fixed charge to almost every residential customer, with or without solar. On May 9, 2024 the CPUC approved a monthly fixed charge ('Base Services Charge') of $24.15, with $6 for CARE and $12 for FERA or deed-restricted affordable housing. It lowers per-kWh prices by 5-7 cents. Start dates: SDG&E October 2025, SCE November 2025, PG&E March 2026. Solar customers pay it too.[7] Solar cannot reduce it, and at SDG&E it cannot even be paid with export credits: For Solar Billing Plan customers the Base Services Charge is non-nettable, so export credits cannot pay it.[8] It does not change whether solar pays, but it does mean your bill will never reach zero.
Los Angeles and Sacramento play by different rules
Municipal utilities are not under the CPUC's Net Billing Tariff:
- LADWP (Los Angeles) still credits exports at retail energy prices under its own net metering rider, which makes a system sized to your yearly use the simplest choice. Its average residential price was 23.84¢ per kWh[2].
- SMUD (Sacramento) pays a flat 9.60¢ per kWh[9] for exports on its Solar and Storage Rate, and offers $300 per kWh of battery, up to $6,000 per household, for interconnection applications submitted on or after Sept. 23, 2026. Earlier projects got $500/kWh up to $10,000 if enrolled by Dec. 31, 2026. Tesla owners also receive quarterly payments.[10].
The difference is large enough that the same system pays back years faster in some cities than in others; see the city pages below.
Batteries under NEM 3.0
Because exports at midday earn little and evening power is expensive, a battery that stores afternoon solar for the evening peak is more valuable in PG&E, SCE and SDG&E territory than almost anywhere else. State battery rebates have mostly run dry: SGIP Small Residential Storage[11] is closed[11], and the low-income budget is on a waitlist. Price a battery on the yearly value of the energy it shifts. Our battery comparison lists usable capacity and power from the spec sheets.
Permits and your rights
California caps what a city can charge for a residential solar permit: Cities and counties may not charge more than $450 plus $15 per kW above 15 kW for a residential PV permit. A jurisdiction can charge more only with a written finding and an adopted resolution or ordinance showing the reasonable cost. The section sunsets January 1, 2034.[14] Cities and counties must offer an online automated permitting platform such as SolarAPP+ for residential solar up to 38.4 kW AC and paired batteries. Deadlines: September 30, 2023 for jurisdictions over 50,000 people and September 30, 2024 for cities of 50,000 or fewer. Exempt: cities under 5,000 people and counties under 150,000 (including their cities).[15] Every solar sale needs a standard disclosure document, and you have a right to cancel; our California installer guide covers both and shows how to look up a contractor's license with the CSLB.
Solar cost in California by system size
Same assumptions as the typical home above; only the system size changes. Prices are the state median before incentives and include the incentives our calculator applies by default in California.
| System | Price before incentives[3] | After incentives | kWh in year 1[4] | Year-1 savings[1][6] | Payback (years) |
|---|---|---|---|---|---|
| 4 kW | $13,200 | $13,200 | 6,560 | $1,230 | 10 |
| 6 kW | $19,800 | $19,800 | 9,830 | $1,850 | 10 |
| 8 kW | $26,400 | $26,400 | 13,110 | $2,320 | 10 |
| 10 kW | $33,000 | $33,000 | 16,390 | $2,480 | 12 |
| 12 kW | $39,600 | $39,600 | 19,670 | $2,650 | 13 |
Incentives that lower the price in California
Business credit for leased and PPA systems (48E)
Claimed by the system owner, not the homeowner; solar must begin construction by July 4, 2026 or be in service by December 31, 2027[17]
If a company owns the panels on your roof (a lease or power purchase agreement), that company may claim the business clean electricity investment credit and can reflect it in your price. You cannot claim it yourself.
- Who
- Third-party-owned systems (leases and PPAs). Ask the provider whether the price assumes this credit.
- Deadline
- December 31, 2027
- Checked
- November 5, 2026
Active solar energy system new-construction property tax exclusion (Rev. & Tax. Code 73)
Adding an active solar energy system (including storage devices that are part of it) is not treated as 'new construction', so it does not raise the assessed value. Ends January 1, 2027. Systems that qualify before then stay excluded until the property changes hands.[12]
Subd. (i)(2): systems that qualify for an exclusion before January 1, 2027 continue to be excluded until there is a subsequent change in ownership. Subd. (g) says the section applies to lien dates for fiscal years 1999-2000 through 2025-26. The leginfo cross-reference list shows no 2026 chaptered bill amending section 73. The BOE analysis of SB 710 (https://boe.ca.gov/legdiv/pdf/0710sb090525ml.pdf) says 'any solar installation post January 1, 2027 would be considered new construction and would…
- Who
- Owners who add an active solar energy system to property. The system must qualify before January 1, 2027. The exclusion lasts until the next change in ownership.
- Deadline
- January 1, 2027
- Checked
- November 5, 2026
Disadvantaged Communities - Single-family Solar Homes (DAC-SASH)
$3/watt incentive for rooftop solar for income-qualified homeowners in disadvantaged communities[18]
Budget: '$120 million total ($10 million per year 2019 - 2030)'. SDG&E's Solar Billing Plan page still lists DAC-SASH as a current assistance program. I could not confirm current intake on the administrator page (gridalternatives.org returned 403).
- Who
- Income-qualified (CARE/FERA-eligible) single-family homeowners in CalEnviroScreen disadvantaged communities or San Joaquin Valley pilot communities, in IOU territory. GRID Alternatives administers the program.
- Deadline
- Program budget is $10 million per year for 2019-2030 ($120 million total).
- Checked
- November 5, 2026
SGIP Residential Solar and Storage Equity (RSSE)
$1.10/Wh for storage plus $3.10/W for solar (current step 6), for low-income households[19]
The CPUC budget table lists RSSE at 'Storage: 1,100' ($/kWh) and 'Solar: 3,100/kW'. Rates and status were confirmed on the SGIP step tracker (https://www.selfgenca.com/home/program_metrics/) as of 11/5/2026, which lists 'Solar $3.10/W' and 'Energy Storage $1.10/Wh' at Step 6. RSSE AB 209: CSE, SCG and LADWP on Waitlist. AB 209 Non-POU: SCE and PG&E on Waitlist. AB 209 POU: SCE 'Open' ($1,000,000 available), PG&E Waitlist. RSSE Ratepayer: Closed in all four IOU territories. The $280M figure is…
- Who
- Low-income residential customers installing paired solar and storage. The CPUC has authorized $280 million for this budget.
- Deadline
- Ends when funds run out. As of 11/5/2026 the AB 209 sub-budgets are on waitlist in most administrator territories.
- Checked
- November 5, 2026
All California incentives, including utility and local programs →
How California utilities credit your solar
PG&E, SCE and SDG&E customers who applied on or after April 15, 2023 are on the Net Billing Tariff (often called NEM 3.0): exports earn hourly avoided-cost credits that are far below retail, locked for 9 years. Los Angeles (LADWP) and Sacramento (SMUD) are municipal utilities with their own rules: LADWP still credits exports at retail energy prices, and SMUD pays a flat export rate.[20]
| Utility | Export policy | Export credit | Avg. residential price | Monthly basic charge |
|---|---|---|---|---|
| LADWP | Net Energy Metering Rider (LADWP, municipal; not subject to CPUC NEM 3.0) | Retail rate (net metering)[21] | 23.84¢ per kWh[2] | n/a |
| PG&E | Solar Billing Plan (Net Billing Tariff, 'NEM 3.0') | Hourly avoided-cost credits; we model about 5¢ per kWh (estimate)[6] | 39.62¢ per kWh[2] | $24.00[22] |
| SMUD | Solar and Storage Rate (SSR, Rate Schedule SSR; SMUD municipal, not subject to CPUC NEM 3.0) | 9.60¢ per kWh[9] | 17.87¢ per kWh[2] | $27.00[23] |
| SDG&E | Solar Billing Plan (Net Billing Tariff, 'NEM 3.0') | Hourly avoided-cost credits; we model about 5¢ per kWh (estimate)[24] | 43.63¢ per kWh[2] | $24.00[8] |
| SCE | Solar Billing Plan (Net Billing Tariff, 'NEM 3.0') | Hourly avoided-cost credits; we model about 5¢ per kWh (estimate)[25] | 32.43¢ per kWh[2] | $24.15[26] |
Solar costs in California cities
Output, utility rules and local permits differ by city. Each city page uses its own PVWatts estimate and its utility's prices.
Next steps
FAQ
Frequently asked questions
How much do solar panels cost in California in 2026?
About $12,200 est.[2,3,4] before incentives for a 3.7 kW est.[2,4] system that covers average use, at the state median of $3.30 per watt est.[3]. There is no longer a federal credit for homeowners who buy, so that is also close to the net price for most buyers outside the few remaining low-income programs.
Is solar worth it in California under NEM 3.0?
Can I keep NEM 2.0 if I buy a house that already has solar?
Usually yes. Customers interconnected under NEM 2.0 (complete applications by April 14, 2023) may stay on NEM 2.0 for 20 years from their interconnection date, per D.14-03-041.[5] PG&E notes that the legacy period follows the system, not the owner: PG&E says the 20-year NEM legacy period is tied to the system, not the owner. A buyer inherits the remaining years.[16]
Does NEM 3.0 apply in Los Angeles?
No. LADWP is a municipal utility with its own net metering rider, which still credits exports at retail energy prices. Sacramento's SMUD also has its own rate, with a flat export credit of 9.60¢ per kWh[9].
sources
[ 26 ]Every number on this page links to one of these sources. Dates show when we last checked each one.
- EIA Electric Power Monthly, Table 5.6.B: Average price of electricity by state, year-to-date (August 2026, preliminary)eia.gov · checked Nov 5, 2026
- EIA Electric Sales, Revenue, and Average Price 2024, Table 6: Utility bundled retail sales, residentialeia.gov · checked Nov 5, 2026
- U.S. Distributed Solar and Storage 2026 Data Update (Barbose, Darghouth, O'Shaughnessy, Forrester), Berkeley Labeta-publications.lbl.gov · checked Nov 5, 2026
- NREL/NLR PVWatts v8 (1 kW-DC, fixed roof mount, 20° tilt, south-facing, 14% losses, TMY weather)pvwatts.nlr.gov · checked Nov 5, 2026
- Net Billing Tariff ('NEM 3.0') start date for PG&E, SCE and SDG&Ecpuc.ca.gov · checked Nov 5, 2026
- Net Billing Tariff export creditpge.com · checked Nov 5, 2026
- Income-graduated fixed charge (AB 205) for PG&E, SCE and SDG&Ecpuc.ca.gov · checked Nov 5, 2026
- SDG&E: Fixed charge cannot be offset by solar creditssdge.com · checked Nov 5, 2026
- SMUD: Solar and Storage Rate (SSR, Rate Schedule SSR; SMUD municipal, not subject to CPUC NEM 3.0)smud.org · checked Nov 5, 2026
- SMUD - Battery storage for homeownerssmud.org · checked Nov 5, 2026
- SGIP Program Metrics - Incentive Step Tracker (as of 11/5/2026)selfgenca.com · checked Nov 5, 2026
- California Revenue and Taxation Code section 73 (as amended by Stats. 2025, Ch. 328, SB 710)leginfo.legislature.ca.gov · checked Nov 5, 2026
- 2026 attempt to extend the solar property tax exclusion stalledleginfo.legislature.ca.gov · checked Nov 5, 2026
- Residential solar permit fee cap (Gov. Code 66015)leginfo.legislature.ca.gov · checked Nov 5, 2026
- Automated solar permitting mandate (SB 379, Gov. Code 65850.52)leginfo.legislature.ca.gov · checked Nov 5, 2026
- PG&E: NEM legacy transfers with the homepge.com · checked Nov 5, 2026
- Public Law 119-21 - Sec. 70513(a) and (g)(5) (48E); Sec. 70512(a) and (l)(4) (45Y)govinfo.gov · checked Nov 5, 2026
- CPUC - Solar in Disadvantaged Communitiescpuc.ca.gov · checked Nov 5, 2026
- CPUC - Self-Generation Incentive Program (SGIP)cpuc.ca.gov · checked Nov 5, 2026
- California Solar Rights Act (Civil Code 714) - HOA and deed restrictionsleginfo.legislature.ca.gov · checked Nov 5, 2026
- LADWP: Net Energy Metering Rider (LADWP, municipal; not subject to CPUC NEM 3.0)ladwp.com · checked Nov 5, 2026
- PG&E residential tariffpge.com · checked Nov 5, 2026
- SMUD residential tariffsmud.org · checked Nov 5, 2026
- SDG&E: Solar Billing Plan (Net Billing Tariff, 'NEM 3.0')sdge.com · checked Nov 5, 2026
- SCE: Solar Billing Plan (Net Billing Tariff, 'NEM 3.0')web.archive.org · checked Nov 5, 2026
- SCE residential tariffweb.archive.org · checked Nov 5, 2026
State data last re-checked November 5, 2026.