On this page [ 7 ]
Utah solar at a glance
Estimates use the inputs above and the assumptions in our methodology: Rocky Mountain Power credits exports from new solar customers at about 4.31¢ per kWh; we use it for Utah. Other utilities differ. Prices rise 2.5% a year; panels lose 0.5% a year.
Solar cost in Utah by system size
Same assumptions as the typical home above; only the system size changes. Prices are the state median before incentives and include the incentives our calculator applies by default in Utah.
| System | Price before incentives[3] | After incentives | kWh in year 1[2] | Year-1 savings[4][5] | Payback (years) |
|---|---|---|---|---|---|
| 4 kW | $14,400 | $14,400 | 5,940 | $520 | 24 |
| 6 kW | $21,600 | $21,600 | 8,900 | $780 | 24 |
| 8 kW | $28,800 | $28,800 | 11,870 | $1,040 | 24 |
| 10 kW | $36,000 | $36,000 | 14,840 | $1,300 | 24 |
| 12 kW | $43,200 | $43,200 | 17,810 | $1,560 | 24 |
Incentives that lower the price in Utah
Business credit for leased and PPA systems (48E)
Claimed by the system owner, not the homeowner; solar must begin construction by July 4, 2026 or be in service by December 31, 2027[6]
If a company owns the panels on your roof (a lease or power purchase agreement), that company may claim the business clean electricity investment credit and can reflect it in your price. You cannot claim it yourself.
- Who
- Third-party-owned systems (leases and PPAs). Ask the provider whether the price assumes this credit.
- Deadline
- December 31, 2027
- Checked
- November 5, 2026
How Utah utilities credit your solar
Rocky Mountain Power customers who applied to interconnect after October 30, 2020 are on Schedule 137 'Net Billing Service': exported energy earns a PSC-approved export credit rate (updated each March; 4.855 cents/kWh June-September and 4.033 cents/kWh October-May from March 1, 2026) applied against monthly power and energy charges, with excess credits carrying over within the annual billing period and expiring at its end.[7]
We have not added every Utah utility yet, so the estimates on this page use the state-level rule: Rocky Mountain Power credits exports from new solar customers at about 4.31¢ per kWh; we use it for Utah. Other utilities differ.[5]
Next steps
FAQ
Frequently asked questions
How much do solar panels cost in Utah?
How long does solar take to pay for itself in Utah?
Is there still a federal solar tax credit?
Not for homeowners who buy. The Federal Residential Clean Energy Credit (25D)[8] does not apply to systems whose installation is completed after December 31, 2025. Leased and PPA systems are different: the company that owns the system may still claim a business credit.
sources
[ 8 ]Every number on this page links to one of these sources. Dates show when we last checked each one.
- EIA Electric Sales, Revenue, and Average Price 2024, Table 5A: Residential average monthly bill by stateeia.gov · checked Nov 5, 2026
- NREL/NLR PVWatts v8 (1 kW-DC, fixed roof mount, 20° tilt, south-facing, 14% losses, TMY weather)pvwatts.nlr.gov · checked Nov 5, 2026
- U.S. Distributed Solar and Storage 2026 Data Update (Barbose, Darghouth, O'Shaughnessy, Forrester), Berkeley Labeta-publications.lbl.gov · checked Nov 5, 2026
- EIA Electric Power Monthly, Table 5.6.B: Average price of electricity by state, year-to-date (August 2026, preliminary)eia.gov · checked Nov 5, 2026
- Utah PSC letter approving Rocky Mountain Power Schedule 137 revisions, Docket 26-035-T03 (Feb. 23, 2026)pscdocs.utah.gov · checked Nov 5, 2026
- Public Law 119-21 - Sec. 70513(a) and (g)(5) (48E); Sec. 70512(a) and (l)(4) (45Y)govinfo.gov · checked Nov 5, 2026
- Rocky Mountain Power Utah Electric Service Schedule No. 137 - Net Billing Servicerockymountainpower.net · checked Nov 5, 2026
- IRS FS-2025-05: FAQs for modification of sections 25C, 25D, 25E, 30C, 30D, 45L, 45W, and 179D under Public Law 119-21 (OBBB)irs.gov · checked Nov 5, 2026
State data last re-checked November 5, 2026.