New York utilities compared
| Utility | Export policy | Export credit | Avg. residential price | Monthly basic charge |
|---|---|---|---|---|
| Con Edison | Phase One NEM (Rider R) with Customer Benefit Contribution | Retail rate (net metering)[1] | 35.66¢ per kWh[2] | $21.00[1] |
| NYSEG | Phase One NEM with Customer Benefit Contribution | Retail rate (net metering)[3] | 18.32¢ per kWh[2] | $19.00[4] |
| National Grid | Phase One NEM (PSC 220 Rule 40.1) with Customer Benefit Contribution | Retail rate (net metering)[5] | 17.22¢ per kWh[2] | $19.00[5] |
| PSEG LI | LIPA net metering for Mass Market projects (post-2018) with Customer Benefit Contribution | Retail rate (net metering)[6] | 24.57¢ per kWh[2] | $17.03[6] |
| RG&E | Phase One NEM (PSC 19 Rule 26.A) with Customer Benefit Contribution | Retail rate (net metering)[7] | 18.76¢ per kWh[2] | $23.00[7] |
Average prices are EIA figures for each utility's residential customers; the basic charge is from the utility's residential tariff.
Consolidated Edison Company of New York
Phase One NEM (Rider R) with Customer Benefit Contribution. Residential solar interconnected after March 9, 2017 is net metered under Phase One NEM for 20 years from the in-service date. Each month, exports offset imports kWh-for-kWh at the retail rate. Leftover kWh credits roll forward month to month, and any credits left at the end of the term are forfeited. Systems interconnected on or after Jan 1, 2022 pay a monthly CBC per kW DC, which credits cannot offset.[1]
Charges for solar customers: Standard SC 1 or TOU; the rate option can be changed once a year on the anniversary date
Con Edison tariffs · Con Edison solar page · Serves New York City
New York State Electric & Gas Corporation
Phase One NEM with Customer Benefit Contribution. Same statewide Phase One NEM framework as the other PSC-regulated utilities: retail-rate net metering for 20 years, plus a CBC for systems interconnected from 2022 on.[3]
Niagara Mohawk Power Corporation d/b/a National Grid
Phase One NEM (PSC 220 Rule 40.1) with Customer Benefit Contribution. Mass-market on-site solar gets Phase One NEM, which works the same as standard net metering, for 20 years from interconnection. Unused credits carry over to the next billing period and the next annual period, and are forfeited at the end of the term. Systems interconnected on or after Jan 1, 2022 pay the CBC.[5]
Charges for solar customers: SC1 by default; the SC1 VTOU option can be elected once a year
National Grid tariffs · National Grid solar page · Serves Buffalo
PSEG Long Island (operator for the Long Island Power Authority)
LIPA net metering for Mass Market projects (post-2018) with Customer Benefit Contribution. For Mass Market projects interconnected on or after Jan 1, 2018, net exports are credited to the next bill at the same per-kWh rate charged to non-solar customers in that service class. TOU peak and off-peak credits are tracked separately. Credits are removed at the end of the billing period containing the 20th anniversary of the in-service date. Projects interconnected on or after Jan 1, 2022 pay the CBC, which LIPA bills as a daily charge.[6]
Charges for solar customers: Residential net metering applies only to systems of 25 kW or less and no more than 110% of the last 12 months' load
- Residential service charge: $0.56 per day (about $17.03/month), Rate Codes 180/194/195, effective January 1, 2026[6]
- CBC applies to 2022+ systems: Mass Market projects interconnected on or after Jan 1, 2022 pay the Customer Benefit Contribution[6]
- Battery incentive: NYSERDA Long Island Single-Family Residential Storage Incentive, Block 2: $250/kWh, $309,510 of $5.7M remaining on 2026-11-05[10]
PSEG LI tariffs · PSEG LI solar page · Serves Hempstead
Rochester Gas and Electric Corporation
Phase One NEM (PSC 19 Rule 26.A) with Customer Benefit Contribution. Monthly kWh netting for 20 years from the in-service date. Excess credit value carries over to the next monthly billing period and is forfeited at the end of the term. Projects interconnected on or after Jan 1, 2022 pay the CBC, which net-injection credits cannot offset.[7]
Charges for solar customers: Standard SC, TOU if available, or Standby (Standby moves the customer to Value Stack); election once a year
RG&E tariffs · · Serves Rochester
State rules that apply
- 2026 residential CBC rates (Phase One NEM, $/kW DC per month): Central Hudson $1.67; Con Edison $1.29; LIPA $1.13; National Grid $0.97; NYSEG $1.19; Orange & Rockland $1.00; RG&E $1.31. Applies to residential solar interconnected on or after Jan 1, 2022. Rates change every year and are not locked in.[3]
- Solar access: NY has no automatic right to sunlight. Neighbors can grant voluntary written solar easements, which must state the vertical and horizontal angles and be recorded like other easements (Real Property Law 335-b).[11]
- Community solar alternative: Homeowners and renters can subscribe to a community solar project and receive bill credits without installing panels. NYSERDA says NY leads the U.S. in community solar capacity, with more than 1,300 projects built as of March 2025.[12]
- Statewide Solar for All: Low-income households enrolled in their utility's Energy Assistance Program are automatically enrolled and get a free monthly community-solar bill credit[13]
- NY-Sun residential rebate status: As of Nov 2026, all NY-Sun residential MW Block rebates are fully subscribed in Con Edison, Long Island and Upstate territories, as are the Con Edison and Upstate Affordable Solar blocks. The home battery incentives are still open.[14]
What it means for sizing and batteries
When exports earn close to the retail price, sizing the system to cover your yearly use is usually the best value, and a battery is mainly for backup rather than savings.
The calculator uses each utility's export rate. City pages: Buffalo, Hempstead (Town of Hempstead, Long Island), New York City, Rochester.
FAQ
Frequently asked questions
Does New York have net metering?
Most New York homeowners who go solar are on Phase One net metering: exports offset purchases at the retail rate and roll over month to month. Systems interconnected after 2021 pay a monthly Customer Benefit Contribution (CBC) charge per kW of solar. PSEG Long Island, run for the Long Island Power Authority, has its own similar rules.
What does Con Edison pay for exported solar?
Con Edison offsets exported energy at retail under Phase One NEM (Rider R) with Customer Benefit Contribution.
What does NYSEG pay for exported solar?
NYSEG offsets exported energy at retail under Phase One NEM with Customer Benefit Contribution.
What does National Grid pay for exported solar?
National Grid offsets exported energy at retail under Phase One NEM (PSC 220 Rule 40.1) with Customer Benefit Contribution.
sources
[ 14 ]Every number on this page links to one of these sources. Dates show when we last checked each one.
- Con Edison: Phase One NEM (Rider R) with Customer Benefit Contributionconed.com · checked Nov 5, 2026
- EIA Electric Sales, Revenue, and Average Price 2024, Table 6: Utility bundled retail sales, residentialeia.gov · checked Nov 5, 2026
- NYSEG: Phase One NEM with Customer Benefit Contributionnyserda.ny.gov · checked Nov 5, 2026
- NYSEG residential tariffwww2.dps.ny.gov · checked Nov 5, 2026
- National Grid: Phase One NEM (PSC 220 Rule 40.1) with Customer Benefit Contributionwww2.dps.ny.gov · checked Nov 5, 2026
- PSEG LI: LIPA net metering for Mass Market projects (post-2018) with Customer Benefit Contributionlipower.org · checked Nov 5, 2026
- RG&E: Phase One NEM (PSC 19 Rule 26.A) with Customer Benefit Contributionwww2.dps.ny.gov · checked Nov 5, 2026
- Con Edison: 2026 CBC (Phase One NEM, solar PV, SC 1)coned.com · checked Nov 5, 2026
- National Grid: 2026 CBC (Phase One NEM, solar PV, SC1)nationalgridus.com · checked Nov 5, 2026
- PSEG LI: Battery incentivenyserda.ny.gov · checked Nov 5, 2026
- Solar accessnysenate.gov · checked Nov 5, 2026
- Community solar alternativenyserda.ny.gov · checked Nov 5, 2026